preloader
Transforming Visions into Reality

Monthly Archives: September 2019

Owners of downtown Los Angeles’ historic Hotel Figueroa celebrated its Aug. 14 birthday by unveiling a $60 million renovation of its 92-year-old bones. The iconic structure’s makeover, however, was two years overdue and cost $16 million more than initially expected. Renovation to restore the hotel to its original Spanish Mediterranean flair started in November 2015 […]

About three dozen development projects, valued around $3.5 billion, are underway or in the pipeline in Long Beach. The port city of Long Beach, Calif., has long struggled to revive its downtown core, which steadily deteriorated as the Navy pared down and eventually closed its decades-old operations there by the late ’90s, with military contractors […]

Sonata Modern Flats (207 Seaside Way) in Long Beach, CA hit a huge schedule milestone today with the podium deck concrete top-out. Despite the Long Beach Grand Prix throwing a wrench into the schedule, the portion of work was delivered on time thanks to our trade partners and dedicated team!

© 2019 ALL RIGHTS RESERVED, New Gateway | LICENSE # CA 123456 B